Inspections of burnt forestry operations

Information about EPA inspections of crown forestry operations that are in burnt areas, and where the EPA has issued the Forestry Corporation of NSW (FCNSW) Site-Specific Operating Conditions that supplement the Integrated Forestry Operations Approvals. Future updates will provide more information.

This information was updated on 17th September 2020 and is based on information collected since 15 April. Future updates will include details of private native forest inspections and non-burnt crown land inspections.
The next update will be on 1st October 2020.



Operations being planned by FCNSW, additional controls not requested – FCNSW planning is underway but Site-Specific Operating Conditions have not been requested.
0 sites out of 28 have been inspected by the EPA.

graph showing Operations being planned by FCNSW, additional controls not requested

Operations with Site-Specific Operating Conditions but not commenced – conditions have been issued and FCNSW planning has been finalised but harvesting has not commenced.

1 site out of 9 has been inspected by the EPA.

graph showing Operations with Site-Specific Operating Conditions but not commenced
   

Operations with Site-Specific Operating Conditions where harvesting has commenced - trees are being harvested.
13 sites out of 14 have been inspected by the EPA

graph showing Operations with Site-Specific Operating Conditions where harvesting has commenced

Operations with Site-Specific Operating Conditions that are completed - harvesting has ceased and the operation in the forest is concluded.
2 sites out of 2 have been inspected by the EPA

graph showing Operations with Site-Specific Operating Conditions that are completed

 

Summary of operations

(i) indicates an inspection has taken place

Operations being planned by FCNSW, additional controls not requested

*as provided by FCNSW

Operations with Site-Specific Operating Conditions but not commenced 

Operations with Site-Specific Operating Conditions where harvesting has commenced 

Operations with Site-Specific Operating Conditions that are completed 

0 sites out of 28 have been inspected by the EPA

 1 site out of 9 has been inspected by the EPA

13 sites out of 14 have been inspected by the EPA

2 out of 2 sites have been inspected by the EPA

6 in Eden

2 in Lower North Coast
9 in South Coast

1 in Tumut

10 in Upper North Coast

 

Tumut
Bago 23A, 26A
Bago 5A
Bago 73A 
 

Lower North Coast
Collombatti COL009 COL010 COL011 COL012

 

Upper North Coast
Bungawalbin BWN001 BWN002 BWN003 BWN004 BWN005

Doubleduke 1–3
Doubleduke 5–8

Girard
GRD008 GRD009

Myrtle MYR010 MYR011 MYR012 MYR013 MYR014 MYR015 MYR016(i)

Eden
Yambulla 269A,290A (i)
Yambulla 299A (i)
Yambulla 342A,343A (i)
Yambulla 345A,350A,355A,357A(i)
Yambulla 415A, 418A, 423A, 483A, 484A, 506A, 507A, 508A


Upper North Coast
Bagawa BGW028 (i)


Lower North Coast
Styx River 10,11 (i)
Riamukka RIA014 RIA015 RIA022 RIA025 RIA026 RIA028 RIA029 (i)
Riamukka 81,96 (i)


South Coast
Mogo 161A,173A (i)
South Brooman 60A (i)


Tumut
Bago 10A (i)
Bago 46A,47A,48A (i)
Bago 75A (i)

South Coast
Mogo 174A (i)
South Brooman 58A (i)

 