Inspections of burnt forestry operations

Information about EPA inspections of crown forestry operations that are in burnt areas, and where the EPA has issued the Forestry Corporation of NSW (FCNSW) Site-Specific Operating Conditions that supplement the Integrated Forestry Operations Approvals. Future updates will provide more information.

This information was updated on 22nd February 2021 and is based on information collected since 15 April 2020. Future updates will include details of private native forest inspections and non-burnt crown land inspections. 
The next update will be by 12th March 2021.

Operations being planned by FCNSW, Site-Specific Operating Conditions not requested– FCNSW planning is underway but Site-Specific Operating Conditions have not been requested.
0 sites out of 68 have been inspected by the EPA. 

graph showing Operations being planned by FCNSW, additional controls not requested

Operations where additional Site-Specific Operating Conditions have been sought by FCNSW – operations where FCNSW have requested to be issued Site-Specific Operating Conditions but they have not been issued.

0 sites out of 0 have been inspected by the EPA. 

graph showing operations where harvesting has commenced - no sites
   

Operations with Site-Specific Operating Conditions but not commenced – conditions have been issued and FCNSW planning has been finalised but harvesting has not commenced.

1 site out of 2 has been inspected by the EPA. 

graph showing Operations with Site-Specific Operating Conditions but not commenced

Operations with Site-Specific Operating Conditions where harvesting has commenced - trees are being harvested.

1 sites out of 2 have been inspected by the EPA. 

graph showing Operations with Site-Specific Operating Conditions where harvesting has commenced

Operations with Site-Specific Operating Conditions that are completed - harvesting has ceased and the operation in the forest is concluded.
15 sites out of 15 have been inspected by the EPA. 

graph showing Operations with Site-Specific Operating Conditions that are completed

 

 

Summary of operations

(i) indicates an inspection has taken place

Operations being planned by FCNSW, Site-Specific Operating Conditions not requested
*as provided by FCNSW
Operations where additional Site-Specific Operating Conditions have been sought by FCNSW Operations with Site-Specific Operating Conditions but not commenced Operations with Site-Specific Operating Conditions where harvesting has commenced Operations with Site-Specific Operating Conditions that are completed

0 sites out of 68 have been inspected by the EPA

 0 sites out of 0 have been inspected by the EPA  1 out of 2 sites has been inspected by the EPA

1 out of 2 sites have been inspected by the EPA

15 out of 15 sites had been inspected by the EPA

North Coast 

Bachelor 1, 2 

Ballengarra 12, 14, 15 

Barrington Tops 15, 16 

Boambee 4, 5, 6, 7 

Bom Bom 1, 2, 4 

Broken Bago 24, 25, 26, 27 & Bulls Ground 13 

Bulga 47, 50, 51 

Camira 7, 8, 9, 10, 11 

Cherry Tree 3, 4 

Clouds Creek 34, 35, 36 

Clouds Creek 16, 17, 18, 19 

Collombatti 11, 12 

Conglomerate 23 

Coopernook 6 

Coopernook 1, 2, 4, 5, 7 

Doubleduke 1, 2, 3 

Ellis 3, 4, 5, 6, 7 

Enfield 43, 44, 45, 46, 47 

Ewingar 77, 78, 79 

Gibberagee 7, 8, 9 

Giro 7, 8 

Kangaroo River 42, 43, 44, 45 

Kiwarrak 7 

Kiwarrak 11, 12, 13 

Knorrit 6, 7, 8, 9 

Lansdowne 21 

Lansdowne 7, 8 

Little Newry 2 

Middle Brother 3, 4 

Nambucca 10, 11, 14 

Newry 21, 22, 26, 27, 28 

Newry 23, 24, 25 

Oakes 17, 18, 19, 20, 21 

Wedding Bells 4, 6–11, 13, 14, 29 

Wedding Bells Orara East 1, 2, 3, 22, 25, 26 

Ourimbah 8, 9 

Queens Lake 1, 2, 3 

Richmond Range 2 

Sheas Nob 6, 7 

Styx River 12, 13, 14 

Tamban 2, 3 

Tamban 28, 30, 31 

Tamban 12, 13 

Tuggolo 22, 23, 24 

Wild Cattle Creek 50 

Yarratt 1, 2, 3, 4, 5 


South Coast 

Bago 54a, 55a, 63a 

Bago 80a, 82a, 83a, 84a, 85a 

Bodalla 3034a 

Bondi 1210a 

Nungatta 8003a 

Currowan 502a, 503a 

Eastboyd 186a, 187a 

Eastboyd 11a, 12a, 13a 

Mogo 180a 

Nadgee 95a 

Nadgee 116a, 117a 

Nalbaugh 1304a 

Shallow Crossing 208a, 209a, 210a 

Shallow Crossing 211a 

Southbrooman 55a, 56a, 66a 

Southbrooman 52a, 53a, 54a 

Tallaganda 2450a 

Tantawangalo 2408a 

Yambulla 301a 

Yambulla 303a 

Yambulla 302a 

Yambulla 291a, 298a 


*This now contains all planned operations, not just operations FCNSW intends to request SSOCs for, as this info is no longer available due to a change in process 

 
 

Tumut
Bago 5A

 

Upper North Coast

Doubleduke 1–3

Tumut

Bago 23A, 26A (i)
Bago 73A 

 

Eden
Yambulla 269A,290A (i)
Yambulla 299A (i)
Yambulla 342A,343A (i)
Yambulla 345A, 350A, 355A, 357A (i)


Lower North Coast
Riamukka RIA014 RIA015 RIA022 RIA025 RIA026 RIA028 RIA029 (i)
Riamukka 81,96 (i)
Styx River 10,11 (i)

 

South coast
Mogo 174A (i)
Mogo 161A,173A (i)
South Brooman 58A (i)
South Brooman 60A (i)

 

Tumut
Bago 10A (i)
Bago 75A(i)

Bago 46A,47A,48A (i)
 

Upper North Coast
Bagawa BGW028 (i)

Page last updated