Non-Compliance detail


  
Summary
 
Licence number: 4965
Annual Return Start: 01 Jul 2008
Annual Return End: 30 Jun 2009
Date Received: 30 Jul 2009
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O3.1 Appropriate treatment process not followed, not all flows received full treatment due to equipment failure resulting in tertiary bypass during wet weather flows. EPA to monitor future compliance with this condition 1
L1.1 Equipment failure (including telemetry and remote control systems). Approx 0.1ML of fully treated disinfected effluent was discharged up stream of authorised discharge point due to break in RE pipe. EPA to monitor future compliance with this condition 1
L8.1 Wet weather overflow frequency exceeded the licence limit of 12 in 10 years. Results from hydraulic sewer system model comparisons predicted an overflow frequency of 23. EPA to monitor future compliance with this condition 1
O5.1 Unable to demonstrate ongoing improvement in environmental performance as odour complaints over the five year period 2004-2009 were higher than the five year average over 1995-2000. EPA to monitor future compliance with this condition 1