Non-Compliance detail


  
Summary
 
Licence number: 378
Annual Return Start: 01 Jul 2022
Annual Return End: 30 Jun 2023
Date Received: 29 Aug 2023
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O4.7 Exceedance of odour compliants benchmark indicator in relation to O4.8 EPA action determined as part of scheduled inspection program 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 1
O4.1 Effluent not treated in accordance with appropriate treatment process requirements EPA action determined as part of scheduled inspection program 1