Non-Compliance detail


  
Summary
 
Licence number: 378
Annual Return Start: 01 Jul 2019
Annual Return End: 30 Jun 2020
Date Received: 28 Aug 2020
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O4.7 Unable to demonstrate improvement in environmental performance due to exceedance of odour complaints benchmark indicator. EPA has written to licensee regarding non-compliance and relevant action 1
L2.1 Exceedance of the load limit for oil and grease. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L7.4 Exceedance of the dry weather overflow frequency limit. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA has written to licensee regarding non-compliance and relevant action 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve. EPA to monitor future compliance with this condition 1
L1.4 Pollution of waters from a pumping station during dry weather. EPA has written to licensee regarding non-compliance and relevant action 1