Non-Compliance detail


  
Summary
 
Licence number: 372
Annual Return Start: 01 Jul 2015
Annual Return End: 30 Jun 2016
Date Received: 30 Aug 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O4.1 Sewage or effluent not treated in accordance with appropriate treatment process requirements due to the incoming sewage load for screening was greater than the screen design capacity. Screens were cleared and equipment restarted. EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled flow due to blockage of major pipe, channel or valve. Blockage in pipe cleared and cleaned by Sydney Water crew.CCTV of the sewer line scheduled EPA to monitor future compliance with this condition 19
L1.3b Directed overflow due to blockage of major pipe, channel or valve. Blockage cleared. A CCTV inspection of the sewer pipe will be programmed. Any further remedial actions deemed necessary will be carried out EPA to monitor future compliance with this condition 11
L1.4 Pollution of waters from a pumping station during dry weather. Manual clean up and flushing undertaken. EPA to monitor future compliance with this condition 1
O4.9 Exceedance of the wet weather partial treatment discharges frequency limit EPA to monitor future compliance with this condition 1
O4.7 Unable to demonstrate improvement in environmental performance due to exceedance of odour complaints benchmark indicator and wet weather overflows benchmark. EPA to monitor future compliance with this condition 1