Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O3.4b Not all flows received appropriate treatment due to failure of the rising main at SPS 797 Appropriate Action taken by licensee 1
L4.1(a)(i) Uncontrolled overflow during dry weather, sewage overflow to creek caused by tree roots / debris EPA to monitor future compliance with this condition 6
O3.1 Appropriate treatment process not followed, not all flows received full treatment at Wollongong STP due to power supply failure . EPA to monitor future compliance with this condition 1
L1.4(a) ii Directed overflows other than from sewage pumping stations during dry weather, sewage overflow to creek caused by debris EPA to monitor future compliance with this condition 1
O5.1 Unable to demonstrate improvement to environmental wet weather performance for Bellambi Network due to urban consolidation and system growth EPA to monitor future compliance with this condition 1
L3.1 Exceedance of concentration limit for Aluminium. Av. Concentration limit of 79ug/L (av. result was 93.4 ug/L) due to old aluminium sample tube which had broken down over time and contaminated samples collected. EPA to monitor future compliance with this condition 1