Non-Compliance detail


  
Summary
 
Licence number: 218
Annual Return Start: 01 Jul 2003
Annual Return End: 30 Jun 2004
Date Received: 30 Aug 2004
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.4b Power failure on 25/8/04 causinf overflow at SPS145. EPA to monitor future compliance with this condition 1
R4.1 Overflow from W'gong STP on 6.4.04 not reported. Appropriate Action taken by licensee 1
L1.2 SPS 1007 (Ritchie Cres, Dapto) overflow into class "p" waters on 17.04.04 due to power failure. Appropriate Action taken by licensee 1
PRP003 Completion date of 30/6/04 not met due to delays in construction schedule Appropriate Action taken by licensee 1
L1.4(a)i Blockage caused by tree roots. Overflow into stormwater. 5.8.03; 22.1.04; 31.03.04; 28.05.04 N/A 4
O2.1(a) Maintenance not achieved for response target for licensing period, due to seasonal factors. N/A 1
O6.1 Unable to demonstrate improvement to environmental performance sue to modelling for reporting period. N/A 1