Non-Compliance detail


  
Summary
 
Licence number: 1963
Annual Return Start: 01 Jul 2021
Annual Return End: 30 Jun 2022
Date Received: 26 Aug 2022
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.1 Exceedance of the load limit for Total Suspended Solids EPA action determined as part of scheduled inspection program 1
M2.4 Sample not analysed within specified frequency due to lab processing error EPA action determined as part of scheduled inspection program 1
M2.4 Sample not analysed within specified frequency due to unconfirmed test result traceability EPA action determined as part of scheduled inspection program 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA action determined as part of scheduled inspection program 6