Non-Compliance detail


  
Summary
 
Licence number: 1963
Annual Return Start: 01 Jul 2001
Annual Return End: 30 Jun 2002
Date Received: 29 Aug 2002
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.4(a) Pipe collapsed with subsequent discharge to creek N/A N/A
L1.2 Pipe collapsed with subsequent discharge to creek. N/A N/A
O3.1 Dry weather biological bypass due to power failure at the STP due to high winds N/A N/A
L1.2 Power outages may have caused overflows from 4 SPSs. N/A N/A
O3.2 Dry weather biological bypass due to power failure at the STP due to high winds. N/A N/A
L1.4(b) Power outages may have caused overflows from 5 SPSs. N/A N/A
L7.1 Power outage may have caused overflows from 5 SPSs. N/A N/A
L1.2 Overflow from SPS 861 during extreme wet wetaher into unnamed tributary, N/A N/A
L1.4 a (i) 1overflow of the reticulation system reached waterways in dry weather, due to blockages caused by tree roots, debris, fat buildup or broken structures. N/A N/A
O6.1 Comparison of wet weather STP overflow performance in reporting period with 1994 benchmark year performance not done, because hydraulic sewer system model for reporting period not developed / calibrated to accuracy required by the licence. N/A N/A
O5.1 Comparison of wet weather overflow performance in reporting period with 1994 benchmark year performance not done, because hydraulic sewer system model for reporting period not developed / calibrated to accuracy required by the licence. N/A N/A
O5.2(c) Comparison of wet weather overflow performance in reporting period with 1994 benchmark year performance not done, because hydraulic sewer system model for reporting period not developed / calibrated to accuracy required by the licence. N/A N/A
O1.3 Complaint from neighbour regarding odours from premises. N/A N/A