Licence number: 1963
Annual Return Start: 01 Jul 2020
Annual Return End: 30 Jun 2021
Date Received: 27 Aug 2021
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L7.4 Exceedance of the dry weather overflow frequency limit Non-compliance(s) under investigation 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L3.1 Exceedance of the 90 percentile concentration limit for Ammonia Nitrogen Non-compliance(s) under investigation 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
O4.1 Sewage or effluent not treated in accordance with appropriate treatment process requirements EPA to monitor future compliance with this condition 2
O4.1 Sewage or effluent not treated in accordance with appropriate treatment process requirements EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Uncontrolled sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3b Directed sewage overflows during dry weather due to blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
M2.8 Uncollected monitoring samples for biochemical oxygen demand Administrative non-compliance - licensee advised of required action 1