Non-Compliance detail


  
Summary
 
Licence number: 1963
Annual Return Start: 01 Jul 1999
Annual Return End: 30 Jun 2000
Date Received: 30 Aug 2000
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M5.1 Sample not collected on scheduled day. Autosampler did not collect sample due to incorrect programming. N/A N/A
L3.1 Exceedance of NFR 3-day geometric mean due to blocked deep bed sand filters and solids carry over during commissioning stage of new plant as a result of heavy storms, high wet weather flows and SBR PLC programme faults . N/A N/A