Non-Compliance detail


  
Summary
 
Licence number: 190
Annual Return Start: 01 Jul 2006
Annual Return End: 30 Jun 2007
Date Received: 30 Aug 2007
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
1.4 Dry weather sewage overflow from sewage pumping station due to failure of pumps and power failure. Appropriate Action taken by licensee 1
2.1 Requirement to monitor not met, sample not collected. Appropriate Action taken by licensee 3
8.1 Overflow frequency exceeded. EPA to monitor future compliance with this condition 1
3.1 Appropriate treatment process not followed, not all flows received full treatment due to power failure. N/A 1
5.1 Unable to demonstrate improvement to environmental performance. N/A 1