Non-Compliance detail


  
Summary
 
Licence number: 1729
Annual Return Start: 01 Jul 2019
Annual Return End: 30 Jun 2020
Date Received: 28 Aug 2020
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
O4.1 Equipment failure {including telemetry and remote control systems} EPA to monitor future compliance with this condition 1
M2.8 Sample not suitable for analysis EPA to monitor future compliance with this condition 1
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L7.4 Annual limit exceeded EPA to monitor future compliance with this condition 1
L2.6 Flows received at the STP exceeded the process unit{s} hydraulic capacity EPA to monitor future compliance with this condition 1
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
L1.3a Blockage of major pipe, channel or valve EPA to monitor future compliance with this condition 1
O4.7 Exceed odour benchmark EPA to monitor future compliance with this condition 1
L7.2 The frequency of wet weather overflows exceed the St Mary's STS licence limit. PRP to address non-compliance(s) issued 1