Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
1728
Annual Return Start:
01 Jul 2001
Annual Return End:
30 Jun 2002
Date Received:
29 Aug 2002
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
L1.4
4 overflows of the reticulation system reached waterways in dry weather, due to blockages caused by tree roots, debris, fat buildup or broken structures.
N/A
N/A
P1.3
Sample collected from old licensed sampling location due to delays in importing hoses from USA for connection of new sampling point specified in licence.
N/A
N/A
P1.3
Unable to temporarily take flow measurements at new flow measurement structure specified in licence due to delays in commissioning new flow measurement structure.
N/A
N/A
L1.2
Wet weather overflow from SPS to Class P waters.
N/A
N/A
O3.2
Filters became clogged with solids during wet weather event due to clarifier solids washout caused by settling sludge. This resulted in temporary filter bypass.
N/A
N/A
O3.2
Temporary loss of UV disinfection due to power failure at plant
N/A
N/A
O3.2
Power surge to plant resulting in temporary loss of UV disinfection.
N/A
N/A
O3.2
Power failure due to communication error by maintenance staff led to temporary loss of UV disinfection.
N/A
N/A
O3.2
Filters became clogged due to clarifier sludge blanket carryover in wet weather resulting in temporary bypass of filters.
N/A
N/A
G3.3
List of "Authorised staff to liaise with EPA" not updated immediately after departure of staff member on list provided to EPA.
N/A
N/A
O5.1
Comparison of wet weather overflow performance in reporting year with 1994 benchmark year performance not done, because 1994 benchmark year hydraulic sewer system model could not be developed / calibrated to accuracy required by the licence.
N/A
N/A
O5.2
Comparison of wet weather overflow performance in reporting year with 1994 benchmark year performance not done, because 1994 benchmark year hydraulic sewer system model could not be developed / calibrated to accuracy required by the licence.
N/A
N/A
O5.2(b)
Increase in odour complaint incidents.
N/A
N/A
O6.1
Comparison of wet weather overflow performance in reporting year with 1994 benchmark year performance not done, because 1994 benchmark year hydraulic sewer system model could not be developed / calibrated to accuracy required by the licence.
N/A
N/A