Non-Compliance detail


  
Summary
 
Licence number: 1725
Annual Return Start: 01 Jul 2003
Annual Return End: 30 Jun 2004
Date Received: 30 Aug 2004
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.4a(i) 3 overflows of the reticulation system in dry weather, due to blockages caused by tree roots, debris, fat buildup or broken structures. Appropriate Action taken by licensee 3
O2.1(a) Licenseee reported non-compliance with this condition, because internal performance targets for response times to sewer overflows were not consistently met, due to priority given to water main breaks during drought period. Appropriate Action taken by licensee 1
O3.2 On 1 June 2004, not all flows through the STP received tertiary filtration, whilst one filter was being refurbished. Appropriate Action taken by licensee 1
O5.1 Ongoing improvement and no deterioration from existing system performance could not be demonstrated, due to increased 5 year average odour complaints (O5.2(b)). Appropriate Action taken by licensee 1