Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
1695
Annual Return Start:
01 Jul 2004
Annual Return End:
30 Jun 2005
Date Received:
29 Aug 2005
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
L1.4
Overflows on the reticulation system reached waterways in dry weather, due to blockages caused by tree roots, debris, fat builup or broken structures.
N/A
4
M2.1
Samples nor collected and analysed in the required time frame due to analysis error.
N/A
1
O2.1
Licensee reported non-compliance with this requirements, because internal performance targets for response times to sewer overflows were not consistently met, due to priority given to water leaks during drought period.
N/A
1
O3.2
Not all flows received the stipulated treatment due to some hydraulic problems associated with an upgrade of this plant in 2002.
N/A
4
O5.1
Ongoing improvement and no deterioration from existing system performance could not be demonstrated. Sewer System model comparisons indicate that wet weather overflow frequency in reporting period increased compared to frequency in benchmakr year.
N/A
1