Non-Compliance detail


  
Summary
 
Licence number: 1688
Annual Return Start: 01 Jul 2008
Annual Return End: 30 Jun 2009
Date Received: 30 Jul 2009
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.4(a)(i) Uncontrolled overflow during dry weather, sewage overflow to creek caused by tree roots / grease & fat / broken pipe / debris EPA to monitor future compliance with this condition 6
L1.4(a) ii Directed overflows other than from sewage pumping stations during dry weather, sewage overflow to stormwater system caused by debris / choke. EPA to monitor future compliance with this condition 2
O3.2 Appropriate treatment process not followed, not all flows received required treatment resulting in cliff face bypass due to power supply failure at Bondi STP. EPA Ref No 112920 EPA to monitor future compliance with this condition 1
M2.2 Sampling from from correct location was not undertaken at Bondi STP during power supply failure due to staff misunderstanding of sampling location. EPA to monitor future compliance with this condition 1
O5.1 Unable to demonstrate improvement to wet weather environmental performance largely due to urban consolidation. EPA to monitor future compliance with this condition 1