Non-Compliance detail


  
Summary
 
Licence number: 1409
Annual Return Start: 01 Jul 2009
Annual Return End: 30 Jun 2010
Date Received: 27 Aug 2010
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.4(a)(i) Tree roots caused sewer overflow overland for 10m before entering unnamed creek at Blaxland. Blockage cleared. Sewer line cleaned and CCTV. No further work required. Appropriate Action taken by licensee 1
M2.1 Sampled not collected on scheduled day as power to autosampler off. Power restored, autosampler reset to collect sample next day. Operator retrained. EPA to monitor future compliance with this condition 1
O3.1 Not all flows received full treatment due to equipment failure at Penrith. Discharge stopped, leak located, asset isolated until repaired. Creek sampling initiated. Remedial action to refurbish corroded equipment & revise Spillage Incident Procedures Non-compliance(s) under investigation 1