Non-Compliance detail


  
Summary
 
Licence number: 1409
Annual Return Start: 01 Jul 2003
Annual Return End: 30 Jun 2004
Date Received: 30 Aug 2004
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O3.2 Not all flows received full tertiary treatment filtration. Appropriate Action taken by licensee 1
L1.4a(i) 1 overflow of the reticulation system reached waterways in dry weather, due to blockages caused by tree roots. Appropriate Action taken by licensee 1
M2.2(d) Sample was not collected at least 25 days after the previous sample. Appropriate Action taken by licensee 1
O5.1 Ongoing improvement and no deterioration from existing system performance could not be demonstrated EPA has written to licensee regarding non-compliance and relevant action 1
O2.1(a) Licensee reported non-compliance with this requirement, because internal performance targets for response times to sewer overflows were not consistently met, due to priority given to water leaks during drought period. N/A 1