Non-Compliance detail


  
Summary
 
Licence number: 10555
Annual Return Start: 01 Jul 2002
Annual Return End: 30 Jun 2003
Date Received: 28 Aug 2003
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.2 Overflow from pump station SPS918 to Class P waters of Stonequarry Creek Picton on 8 Sep 02. Same incident also reported as non-compliance with L1.4 and L7.1. N/A N/A
L1.4 Overflow from pump station SPS918 to Class P waters of Stonequarry Creek Picton on 8 Sep 02. Same incident also reported as non-compliance with L1.2 and L7.1. N/A N/A
L7.1 Overflow from pump station SPS918 to Class P waters of Stonequarry Creek Picton on 8 Sep 02. Same incident also reported as non-compliance with L1.2 and L1.4. N/A N/A
L3.1 Exceedance of 90 percentile TSS limit in the STP's effluent storage dam. N/A N/A
M2.1 Licensee did not take some effluent quality samples in accordance with the fixed sampling regime in the licence, due to the intermittent and variable regime of the irrigation scheme which reuses the effluent. N/A N/A
O2.1(a) Licensee reported non-compliance with this requirement, because its self-set performance targets for response times in civil maintenance breakdowns were not met, due to abnormal number of incidents during drought period. N/A N/A