Licence conditions for pollution studies and reduction program


  

Licence conditions for pollution studies and reduction programs

Summary
 
Licence number: 4860
Title: PRP 4 Urgent remedial works (Western section of premises)
Start date: 26 Jul 2017
 
Licence Condition
Urgent works are required to be designed and installed to ensure that all runoff from disturbed areas of the premises is treated in accordance with Managing Urban Stormwater: Soils and Construction: Volume 1 March 2004. Landcom and Managing Urban Stormwater Volume 2 E. Mines and Quarries. (the Blue Book).   This includes the following: All works necessary to ensure that all flow from disturbed areas within the premises are directed to the Process Pond or otherwise treated in accordance with the Blue Book. All ‘clean water’ diversion works are designed, constructed and stabilised in accordance with the Blue Book.  All treatment measures in accordance with the Blue Book must be designed and installed to treat any discharge leaving the premises that is not treated by a sediment basin designed and constructed in accordance with the Blue Book. A report must be prepared detailing the calculation and design of all works set out in this PRP including points 1 to 3 and provided to the EPA by email to north.coast@epa.nsw.gov.au