Non-Compliance detail


  
Summary
 
Licence number: 20193
Annual Return Start: 11 Oct 2014
Annual Return End: 10 Oct 2015
Date Received: 10 Dec 2015
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
A1.4 Exceedance of volumetric throughput limit. Penalty Notice issued 2
M5.1 Meteorological station Port of Newcastle Mayfield number 4 berth did not provide technical capability to actively monitor temperature and sigma theta at 10 metres. Installation of meteorological station capable of all monitoring. Appropriate Action taken by licensee 1