Non-Compliance detail


  
Summary
 
Licence number: 1552
Annual Return Start: 01 Jun 2015
Annual Return End: 31 May 2016
Date Received: 02 Aug 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.1 A process water pipe ruptured onsite resulting in water escaping the site boundary & entering roadway stormwater drain. It is understood that a join failed under pressure. The leak was identified and isolated & clean up undertaken. EPA to monitor future compliance with this condition 1