Non-Compliance detail


  
Summary
 
Licence number: 1552
Annual Return Start: 01 Jun 2014
Annual Return End: 31 May 2015
Date Received: 27 Jul 2015
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Monitoring at Points 14&15 not undertaken as required due to technical fault with HVAS; and Points 16,20,21&23 not monitoring on two dates as sites not considered safe access due to severe storm event. EPA to monitor future compliance with this condition 3