Non-Compliance detail


  
Summary
 
Licence number: 11205
Annual Return Start: 03 May 2019
Annual Return End: 02 May 2020
Date Received: 24 Jun 2020
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.2 Point 23,36 - Second round of air emission testing for Redry boiler and Biomass boiler not undertaken EPA to monitor future compliance with this condition 1
L4 Monitoring Points 32 and 33, LAeq and LAmax were greater than the EPL limit. PRP to address non-compliance(s) issued 1
L2.2 Monitoring Point 23, the Nitrogen Oxides concentration was greater than the EPL limit PRP to address non-compliance(s) issued 1
M2.2 Point 38 - Vacuum pump present in the treatment plant was not be tested. EPA to monitor future compliance with this condition 1