Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Licence conditions for pollution studies and reduction program
Licence conditions for pollution studies and reduction programs
Summary
Licence number:
11205
Title:
2.5MW Wood Fired Redry Boiler Improvement Works
Start date:
30 Oct 2020
Licence Condition
By 30 January 2022 the Licensee must engage a suitably qualified and experienced person/s to: 1. Install a manual butterfly damper at the inlet of each secondary air fan; 2. Reinstate the fan motors; 3. Automate the fan inlet butterfly dampers by adding a 4-20 mA actuator that positions the butterfly dampers according to boiler load; 4. Install a pressure transmitter in the duct between the furnace and evaporator tube bank to serve as the furnace pressure signal; and 5. Install a K-type thermocouple in the duct between the furnace and evaporator tube bank
By 1 March 2022 the Licensee must engage a suitably qualified and experienced person/s to: 1. Install a tapping point in the duct between the evaporator tube bank and the multiclone to suit a flue gas analyser probe; 2. Add tapping points at the inlet and outlet of the multiclone for connecting a manometer for reading the differential pressure; 3. Add the furnace pressure signal to the control system; and 4. Add the ability to manually input the furnace pressure ramping set-point
By 15 May 2022, the Licensee must engage a suitably qualified and experienced person/s to undertake commissioning works for the 2.5MW Boiler Improvement Works
By 20 December 2022, the Licensee must submit a copy of the Commissioning Report for the 2.5MW boiler Improvement Works to the Manager Regulatory Operations - Regional South
The Licensee must engage a suitably qualified and experienced person/s to implement Recommendation 2 of the Air Quality Assessment of Various Emissions to Air to Inform a Pollution Studies Program for a 2.5MW Biomass Boiler within the Bombala Timber Mill, NSW dated 20 February 2020. In particular, the Licensee must implement the steps listed under conditions U1.2 - U1.4 by the relevant nominated dates.