Non-Compliance detail


  
Summary
 
Licence number: 1095
Annual Return Start: 28 Feb 2022
Annual Return End: 27 Feb 2023
Date Received: 03 Apr 2023
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.2 Invincible Colliery Monitoring Point 3 HVAS unit failed. During the period of non-compliance, PM10 & TSP data was unable to be determined for scheduled runs. EPA action determined as part of scheduled inspection program 1
M2.2 No depositional dust (monitoring points 3, 4,5, 6 and 7) results were received for January 2023 due to laboratory error. No depositional dust result for monitoring point 7 was received for February 2022 due to laboratory error. EPA action determined as part of scheduled inspection program 2